nautic.lu Luxembourg · Maritime Solutions

Bridge · km 187.56

Trier-Pfalzel railway bridge

Railway bridge of 1878, with a footway and cycle track. The second place on the river where only the waterway minimum is clear.

Data

Type railway bridge
Moselle kilometrekm 187.56
PlaceTrier (DE)

Air draught

at least 6.00 m

This figure refers to the highest navigable water level (HSW) — the level at which navigation is suspended. So as long as you are allowed to move at all, the Moselle is no higher than that and there is at least this much room under the bridge. At mean water there is considerably more.

The nearest gauge with an HSW value (Trier (downstream)) is 7.7 km away. Over that distance the water surface drops noticeably at high water — an extrapolation would come out too favourable, and so unsafe. Beyond 3 km we do not calculate.

Reference
highest navigable water level (HSW)
Reach
Detzem
Gauge in the same reach
Trier downstream km 195.30, 221 cm
Verification
unconfirmed — a single source

The figure applies in the middle of the navigation span. At the edge of the arch there is less. Aerial, bimini, radar arch and flagstaff all count — and so does the wash of oncoming craft.

Coordinate from a named source: Wikipedia: Eisenbahnbrücke Trier-Pfalzel.

Something to offer? Boat, mooring or rental — free, no account, two minutes to fill in. Usually live within a day.

Post for free
SOS