Stadtbredimus gauge
Luxembourg gauge at the barrage. Current readings from the flood and water-level service inondations.lu.
- Operator
- Administration de la gestion de l'eau
The Moselle
On the Moselle the water level decides more than just draught: it governs the clearance under bridges, the current in the impounded reaches and, beyond a certain point, whether you may navigate at all.

Every Moselle gauge from Apach to Koblenz, straight from PEGELONLINE run by the German waterways administration. Refreshed every 20 minutes.
| km | Gauge | Level | vs. MW | Trend | Situation | Mark I | Mark II | HSW |
|---|---|---|---|---|---|---|---|---|
| 241.8 | Perl | 217 cm | −29 cm | rising | normal | — | — | — |
| 230.5 | Stadtbredimus upstream | 616 cm* | — | rising | normal | — | — | — |
| 229.44 | Stadtbredimus downstream | 224 cm* | — | rising | normal | 370 cm | 450 cm | 530 cm |
| 222.2 | Wincheringen | 223 cm* | — | rising | normal | — | — | — |
| 213.3 | Grevenmacher upstream | 845 cm* | — | steady | normal | — | — | — |
| 212.5 | Grevenmacher downstream | 212 cm | −18 cm | falling | normal | — | — | 520 cm |
| 196.2 | Trier upstream | 931 cm* | — | falling | normal | — | — | — |
| 195.3 | Trier downstream | 220 cm | −84 cm | falling | normal | 520 cm | 580 cm | 695 cm |
| 185.94 | Ruwer | 219 cm | −41 cm | falling | normal | — | — | — |
| 171.7 | Mehring AMS | 214 cm* | — | falling | normal | — | — | — |
| 167.7 | Detzem upstream | 1,117 cm* | — | falling | normal | — | — | — |
| 165.4 | Detzem downstream | 219 cm* | — | falling | normal | — | — | 705 cm |
| 141.7 | Wintrich upstream | 967 cm* | — | steady | normal | — | — | — |
| 141.1 | Wintrich downstream | 225 cm* | — | falling | normal | — | — | 675 cm |
| 124.1 | Zeltingen upstream | 824 cm* | — | falling | normal | — | — | — |
| 123.4 | Zeltingen downstream | 233 cm | −80 cm | falling | normal | — | — | 695 cm |
| 103.13 | Enkirch upstream | 972 cm* | — | rising | normal | — | — | — |
| 102.6 | Enkirch downstream | 227 cm* | — | falling | normal | — | — | 780 cm |
| 78.48 | Sankt Aldegund upstream | 921 cm* | — | rising | normal | — | — | — |
| 78.1 | Sankt Aldegund downstream | 239 cm* | — | steady | normal | — | — | 775 cm |
| 59.7 | Fankel upstream | 921 cm* | — | steady | normal | — | — | — |
| 58.9 | Fankel downstream | 222 cm* | — | falling | normal | — | — | 780 cm |
| 51.6 | Cochem | 216 cm | −57 cm | steady | normal | 450 cm | 500 cm | 600 cm |
| 37.47 | Müden upstream | 867 cm* | — | steady | normal | — | — | — |
| 36.8 | Müden downstream | 224 cm* | — | falling | normal | — | — | 730 cm |
| 21.04 | Lehmen upstream | 966 cm* | — | steady | normal | — | — | — |
| 20.37 | Lehmen downstream | 203 cm* | — | falling | normal | — | — | 715 cm |
| 2.11 | Koblenz upstream | 201 cm* | — | steady | normal | — | — | — |
Readings from different gauges are NOT comparable with one another: each gauge has its own zero, and an upstream gauge measures the impounded level above the weir. What compares is the “vs. MW” column — the deviation from that station’s own mean level. Stations marked * carry no reference value — usually upstream gauges at a weir, measuring the impounded level.
Mark I: restrictions on navigation. Mark II: navigation stops. HSW: highest navigable water level. Not every gauge carries all three — an empty cell means none is defined for that station.
Retrieved: 6 Nov 2026, 13:54 · Official WSV reading, reproduced without warranty. ELWIS and the notices to skippers are what count.
First flood mark. From here restrictions apply: reduced speed, navigation bans in certain areas, stricter reporting duties. For leisure boats this is the point to hold back — the current increases noticeably and debris starts coming down.
Second flood mark. Navigation is suspended. Anyone still on the water then has a problem — and not only a legal one. The locks go into flood operation or close entirely.
Highest navigable water level. It is the reference for the clearances stated under bridges. If the gauge rises above it, clearance is no longer guaranteed — but by then nobody is navigating anyway.
The other extreme, increasingly an issue in dry summers. The three-metre fairway depth is a target, not a promise. During sustained low water, loading restrictions apply; for leisure boats drawing under 1.50 m the route generally stays navigable.
Messstellen
Luxembourg gauge at the barrage. Current readings from the flood and water-level service inondations.lu.
The main reference gauge for the Upper Moselle. At flood mark I navigation is restricted; at mark II it is suspended.
These are the sources — separate for Luxembourg, Germany and France, because the Moselle passes through three administrations.
| Service | Responsible for | What you find there |
|---|---|---|
| ELWIS | German federal waterways | Gauges, forecasts, notices to skippers, closures, lock operating hours |
| PegelOnline | German gauging stations | Current readings every quarter hour, hydrographs, open data interface |
| inondations.lu | Luxembourg | Water levels and flood forecasts for the Moselle, Sauer, Our and Alzette |
| Vigicrues | France, upper reaches | Flood situation on the French Moselle above Apach |
| WSA Mosel-Saar-Lahn | Moselle waterway | Operating notices, lock closures, construction work |
Check three things before casting off: the current level at the nearest gauge, the forecast for the coming forty-eight hours, and the notices to skippers. The last is the most commonly overlooked — a lock closed for maintenance can make a day passage impossible, and that appears nowhere in the gauge reading.
When the water is rising: better into harbour a day early than a day late. The Moselle rises quickly after heavy rain in the catchment, and berths in the sheltered harbours fill up fast.
Get an email when a gauge crosses Mark I, Mark II or HSW — including the all-clear, free of charge.
Something to offer? Boat, mooring or rental — free, no account, two minutes to fill in. Usually live within a day.
Post for free